For the testing of a new customer administration, the following requirements were set during the specification in
respect of the test environment and the maintenance of it:
-
Backups are made upon request of the testers and take no longer than 15 minutes
-
No changes are implemented in the environment without the explicit permission by mail from the test coordinator
-
Created backups are returned upon the test coordinator’s request within 15 minutes
-
The resetting and securing of environments takes place between 20:00 and 06:00
-
The operating system for the test environment is the same as that of the production environment
-
Connection of system X and Y to the test environment should be available between 06:00 and 20:00
-
Connection of system Z to the test environment should be available between 06:00 and 20:00 within 15 minutes of the
request
-
Connection with system W is simulated by a stub
-
Testers have direct access to tables in the database (reading permissions)
-
The system date should be open to change by the test team
-
It should be possible to store 4 versions of test files
-
Tool A should be available for the creating or copying of complete test cases.
|